CVPPL achieves major milestone with successful launch of Tunnel Boring Machine at 1000 MW Pakal Dul HEP
KISHTWAR : In a remarkable stride towards the accelerated development of the 1000 MW Pakal Dul Hydroelectric (HE) Project, the Tunnel Boring Machine was today successfully launched for the construction of Head Race Tunnel-1. The project is a joint venture of NHPC Ltd. and JKSPDC Ltd- known as Chenab Valley Power Projects Limited (CVPPL).
The launch of the Tunnel Boring Machine (TBM) was executed with precision and excellence in the presence of Hasan Nadeem, Managing Director of CVPPL; Varunjeet Charak, Assistant Commissioner Revenue, Kishtwar; Sandeep Mittal, General Manager (HQ) of CVPPL; Ramesh Mukhiya, General Manager-Hydro Operation Planning (HOP), Pakal Dul H.E. Project, and other senior officials from CVPPL and the TBM contractor, M/s L&T Ltd.
The Pakal Dul H.E. Project is a landmark initiative, and the construction of Head Race Tunnel-1 is a critical component of this venture. The twin Head Race Tunnels, measuring 9.6 km in length and 8.33 m in excavated diameter, will significantly contribute to the generation of 1000 MW of hydroelectric power.
Two state-of-the-art Double Shield TBMs, aptly named Marsu and Aksini, are engaged in the construction, boasting the most advanced technology manufactured by M/s Herrenknecht, Germany. These cutting-edge TBMs have been specially designed to tackle the site’s unique geological conditions and facilitate simultaneous boring and segment lining.
The successful launch of TBM-1 marks a significant milestone in the progress of the Pakal Dul H.E. Project, paving the way for the timely completion of Head Race Tunnel-1. This breakthrough achievement highlights the dedication, expertise, and determination of the entire team involved in the project.
Deputy Commissioner Kishtwar, Dr. Devansh Yadav extended heartfelt congratulations to the entire team of Pakal Dul H.E Project for their exemplary efforts in accomplishing this vital feat. He emphasized the importance of continuing the work with unwavering zeal and enthusiasm to ensure the project’s scheduled completion, contributing to the overall development and prosperity of Kishtwar District.